07-30-2024, 07:36 AM | #1 |
Captain
2366
Rep 679
Posts
Drives: 2025 BMW 540i XDrive
Join Date: Jun 2024
Location: El Puerto de Santa Maria, Spain
|
Build Codes
I have been sitting at build code status 150 for weeks. Figured I would share this for anyone interested.
111: Order Accepted at AG 112: Order scheduled for production (Up to this point, you’ll still be able to make changes to your order. Once the order status reaches 150, your vehicle is on the assembly line and can no longer be updated or have changes made). 150: Production started 151: Body shop started 152: Paint shop started 153: Assembly started 155: Production completed 160: Released for distribution 168: In AG stock 170: Waiting workshop 172: Planned for workshop 174: Workshop entry 176: Workshop complete 180: Waiting for export dispatch 181: Waiting for domestic dispatch 182: Scheduled for carrier delivery 190: In transit to the port of exit 191: Returned to BMW AG 193: Arrived at the port of exit 194: Selected for shipment 195: Shipped from the port of exit 196: Shipment arrival Last edited by AiredaleDad; 08-29-2024 at 04:03 AM.. |
07-30-2024, 09:06 AM | #2 |
Captain
2366
Rep 679
Posts
Drives: 2025 BMW 540i XDrive
Join Date: Jun 2024
Location: El Puerto de Santa Maria, Spain
|
Here is a good U-tube video of the G60 Production line in Dingolfing.
|
Appreciate
3
|
07-30-2024, 11:06 AM | #3 |
Captain
2512
Rep 649
Posts
Drives: MY25 BMW 540 in QC Hell
Join Date: Jul 2023
Location: Ohio, USA
|
Here's what I don't understand. Another forum member (nt25940) with our build week, has stated they have a VIN, and that their status has advanced to '150'. I was a bit surprised by this, considering production technically doesn't start for another 33+ days. Also, makes me curious about the rhyme/reason behind the process and how it works. lol.
|
Appreciate
2
SkykingUSA3344.00 LVBMW2546.50 |
07-30-2024, 12:15 PM | #4 | |
Major
4646
Rep 1,282
Posts |
Quote:
I ordered my car on October 6th 2023 I got my production number on October 11th Status 150 on October 30th Final assembly on November 3rd. |
|
Appreciate
5
|
07-30-2024, 12:24 PM | #5 |
Enlisted Member
92
Rep 33
Posts
Drives: 2013 535i M-Sport
Join Date: Jan 2012
Location: S.E. Pennsylvania
|
I pulled the detail data for my build. As you can see below the car is in Status code 150 (Production Begins).
1. prodVehicleDetails: [{orderStatusCode: "150", overHeadMessage: "Production begins",…}] 1. 0: {orderStatusCode: "150", overHeadMessage: "Production begins",…} 1. " 2. colorCode: "0416" 3. exteriorColor: "Carbon Black Metallic" |
Appreciate
4
|
07-30-2024, 12:57 PM | #6 |
Major
2547
Rep 1,221
Posts
Drives: '24 iX M60 '23 Tesla Model Y-P
Join Date: Jun 2023
Location: Las Vegas
|
The car isn't actually physically being assembled until 151 status. The "production begins" status is a bit of a misnomer. It just means the build is locked and components are being gathered. The assembly line is not until 153 status.
|
Appreciate
4
|
07-30-2024, 01:09 PM | #7 | |
Captain
2512
Rep 649
Posts
Drives: MY25 BMW 540 in QC Hell
Join Date: Jul 2023
Location: Ohio, USA
|
Quote:
|
|
Appreciate
3
|
07-31-2024, 01:27 AM | #8 | |
Captain
2366
Rep 679
Posts
Drives: 2025 BMW 540i XDrive
Join Date: Jun 2024
Location: El Puerto de Santa Maria, Spain
|
Quote:
But basically I think it all depends on where you are in the queue, and how many cars they paint in a day. |
|
Appreciate
3
|
Post Reply |
Bookmarks |
|
|