04-15-2016, 01:46 PM | #24 |
Captain
485
Rep 988
Posts |
I'm saving up for home mods as well.
- Bought my first house as well because I really liked that the previous owner knocked all the walls down to create a nice big open floor plan. The previous owner also took out the drop ceiling so that the room has the exposed wooden beams which really open up the space. - However the previous owner was more of a DIY person so there was no insulation above the wood beams... just the asphalt shingles, the paper felt, then my cathedral ceiling. So as you imagine it gets really hot to the point that the AC cannot keep up. - To keep the look I have to redo the roof with Manufactured Insulated Panels (I think that is what it is called). Essentially it is plywood with 3 inches of foam in between then the asphalt shingles on top. The last quote I got was $17,000. They tell me they can't just do the pitched roof portion over the open space... has to be the whole building per city regulations. I don't even want to know how much more it would be to just do a modern metal roof instead as I know that costs even more. -Since I have the AC unit on the roof, I have to pay an unionized HVAC person another $1,000+ to remove the AC then reinstall again. No wonder when these contractors pull up they are in their $60,000+ bro truck King Ranch Edition Ford F950's or whatever they are called. Also when it comes to home mods... why are the estimates that you see on HGTV shows so much lower than real life estimates?!?! |
Appreciate
0
|
04-15-2016, 03:40 PM | #25 | |
Banned
2132
Rep 3,553
Posts |
Quote:
As for construction workers and making tons of money, depends what you do and where you do it. In some of the booming markets, electricicians can make $50-75/hr as a foreman and same for pipe fitters. Ive had jobs where my jobsite foreman is making more than me as the project manager. But in todays market, i can get away with paying general laborers under $15/hr and supers around the $30-40 mark. Back when the oil fields were booming out here, guys were making well into the 6 figures with barely a highschool diploma. |
|
Appreciate
0
|
04-15-2016, 03:47 PM | #26 | |
Colonel
6058
Rep 2,074
Posts |
Quote:
|
|
Appreciate
0
|
04-15-2016, 03:53 PM | #27 |
Lieutenant General
7571
Rep 11,951
Posts
Drives: MY24 G01 AW Msport
Join Date: Feb 2008
Location: L.I. NY
|
if you have to replace drywall, its not hard.. rip it out and put new one.
measure and cut and screw it on to the wood studs.. cover up the screws with all purpose plaster. let it dry and then sand it down until its smooth and level to drywall. Also applied tape like material where 2 drywalls meet (crack) use plaster to keep tape on drywall . let it dry up and sand it down until smooth. last step is paint. i have done few bathrooms at my parents house...currently doing a bathroom at their house. Whole bathroom was gutted down to wood studs. dont be afraid to ask questions if you go to home depot lol few different types of drywall and sizes, bathroom have cement board for moistures. rest of the rooms have regular drywall. Last edited by nyalpine90; 04-15-2016 at 03:59 PM.. |
Appreciate
0
|
04-15-2016, 04:08 PM | #28 | |
Banned
2132
Rep 3,553
Posts |
Quote:
Ill DIY everything else though from electrical to plumbing to framing. |
|
Appreciate
0
|
04-15-2016, 04:18 PM | #29 | |
Colonel
1648
Rep 2,494
Posts |
Quote:
__________________
|
|
Appreciate
0
|
04-15-2016, 04:36 PM | #30 |
Banned
2132
Rep 3,553
Posts |
Sounds about right. My 1 month project took 4. Only reason it didnt take longer is i really needed to sell it since i had already bought another house.
|
Appreciate
0
|
04-16-2016, 09:00 AM | #31 |
Captain
531
Rep 788
Posts
Drives: LRP M3 E92, MR M3 E93
Join Date: Dec 2012
Location: CT<-->SC
|
say no more
__________________
ENDLESS DETAILS, CT
EPIC MOTORSPORTS, FL Custom Auto Designs Protection Films, CT F.T.B.R. Garage, CT |
Appreciate
1
|
04-16-2016, 10:45 AM | #32 |
Captain
159
Rep 709
Posts |
we just bought our first house 3 years ago and I have about 100 and 1 things to finish around the house and I keep adding new projects to it. My wife is already talking about moving.
__________________
|
Appreciate
0
|
04-16-2016, 11:29 AM | #33 |
Colonel
6058
Rep 2,074
Posts |
I don't mind if it's stuff I can do myself, unfortunately my lack of handy man skills severely limits what I can do myself. Hell took me half a day to change a few light fixtures in the patio.
|
Appreciate
1
|
04-16-2016, 11:53 AM | #34 | |
Captain
159
Rep 709
Posts |
Quote:
and 1 year to finish my 4 raised bed planters for my wife.. the boxes were built and a pile of top soil were dumped last spring. the pile of dirt had its own vegetation grown in it.
__________________
Last edited by kevinbahnz; 04-16-2016 at 12:01 PM.. |
|
Appreciate
0
|
04-16-2016, 01:08 PM | #35 |
Long Time Admirer, First Time Owner
18649
Rep 9,438
Posts |
So why she didn't just use the pile of dirt???
__________________
I have romped on her and I giggled like a drunk infant the entire time. - Sedan_Clan
|
Appreciate
0
|
04-16-2016, 05:11 PM | #37 | |
...
11844
Rep 15,400
Posts |
In 2009, I bought a house. All financing options here were expensive for my taste and since I'm pretty conservative when it comes to financing and debt, and it clashes wildly with my "fuck that shit, I'm home with my kids" side, labor was not something I was willing to pay for.
I bought the house because nobody had ruined with plastic. It was then 70 years old and with a log frame. I knew what I wanted and I sadly had the hours to put in (hubby had more knowledge and I swear to god he made me redo most of the shit I did because my tendency to love speed and to forget skills), we did the whole thing by ourselves. With me fucking up shit, I saved a ton. I learned even more. These days I like flipping smaller things just so I can enjoy using my arms. Construction industry is tough. It is a great hobby but if you can't get the discounts I get, and you're stuck on brands and you can't see the overall concept: I wouldn't bother. It is a great way to keep the babysitter (wife) busy though.
__________________
Quote:
|
|
Appreciate
1
|
04-18-2016, 10:54 AM | #39 |
Long Time Admirer, First Time Owner
18649
Rep 9,438
Posts |
|
Appreciate
0
|
04-18-2016, 11:19 AM | #40 |
Banned
2132
Rep 3,553
Posts |
|
Appreciate
0
|
04-18-2016, 01:16 PM | #42 | |
Lieutenant General
7571
Rep 11,951
Posts
Drives: MY24 G01 AW Msport
Join Date: Feb 2008
Location: L.I. NY
|
Quote:
|
|
Appreciate
0
|
04-18-2016, 01:49 PM | #43 | |
Banned
2132
Rep 3,553
Posts |
Quote:
i watched a crew do some drywall this past weekend on one of my projects. They are so fast and efficient at taping/mudding that little sanding is needed and they are done so quickly. 1500sqft building drywalled ceilings and walls done in 3 days with 5 guys and a lot of that was waiting on mud to dry |
|
Appreciate
0
|
04-18-2016, 02:31 PM | #44 | |
Lieutenant General
7571
Rep 11,951
Posts
Drives: MY24 G01 AW Msport
Join Date: Feb 2008
Location: L.I. NY
|
Quote:
my parents were quoted $7k just labor not including materials for 5'x7' bathroom. I believe thats a lot. |
|
Appreciate
0
|
Post Reply |
Bookmarks |
|
|