BMW i5 and 5-Series Forum

Post Reply
 
Thread Tools Search this Thread
      11-12-2010, 05:13 PM   #1
DougLikesBMW
Fapmin
DougLikesBMW's Avatar
439
Rep
2,660
Posts

Drives: '03 E46 330Ci
Join Date: Mar 2007
Location: Plano, Texas

iTrader: (0)

Lightbulb Chinese workers build 15 story hotel in 6 days!

...and they rested on the 7th.

America is being left in the dust.

Disregard Mexicans, acquire Chinese.

Quote:
http://news.yahoo.com/s/yblog_upshot...-just-six-days

As the United States and China battle over the finer points of currency manipulation at the G-20 summit, American negotiators may want to take note of this startling testimonial to the productivity of Chinese workers: A construction crew in the south-central Chinese city of Changsha has completed a 15-story hotel in just six days. If nothing else, this remarkable achievement will stoke further complaints from American economic pundits that China's economy is far more accomplished than ours in tending to such basics as construction.

[Related: China sets record with new supercomputer]

Meanwhile, it's easy to imagine the disorientation of Changsha residents who'd gone away, or who just hadn't recently ventured into the downtown neighborhood of the new Ark Hotel: "Honey, I don't remember a hotel there, do you?"

The work crew erected the hotel -- a soundproofed, thermal-insulated structure reportedly built to withstand a magnitude 9 earthquake -- with all prefabricated materials. In other words, a crew of off-site factory workers built the sections, and their on-site counterparts arranged them on the foundation for the Ark project.

[Video: How safe is a home built in a week?]

Despite the frenetic pace of construction, no workers were injured -- and thanks to the prefab nature of the process, the builders wasted very few construction materials. Below is a time-lapse video that shows the hotel being built from the ground up in less than a week:

Appreciate 0
      11-12-2010, 05:17 PM   #2
aretardedorange
Banned
173
Rep
609
Posts

Drives: E60
Join Date: Nov 2009
Location: Empire State

iTrader: (6)

I wonder how safe that thing is......
Appreciate 0
      11-12-2010, 05:19 PM   #3
MCMLXXXIX
wat
MCMLXXXIX's Avatar
240
Rep
3,406
Posts

Drives: a gr3at whit3 5hark
Join Date: Oct 2008
Location: Oct 2008

iTrader: (0)

looks like LEGOs. thats incredible
__________________

2012 Toyota Highlander SE - PAST - 2008 e92 335i, 2006 e90 325i
Appreciate 0
      11-12-2010, 05:25 PM   #4
Seminole
Colonel
Seminole's Avatar
United_States
480
Rep
2,032
Posts

Drives: Red Flyer
Join Date: Aug 2008
Location: 38.8977° N, 77.0366° W

iTrader: (2)

Garage List
2008 E90 328i  [7.00]
Since it was pre-fab it's not really that much of a surprise. If all the pieces were already assembled and people worked around the clock the same thing could be accomplished here. And not to nit-pick or anything, but when they stop the time lapse video, the whole bottom half of the building and the top part doesn't have windows installed yet. I'd also be curious to know if that 6 days was just the exterior shell or included all the interior walls, pluming, wiring, etc.

To me some of the stuff they did during WW2, like building a entire Liberty ship from keel to completion in less than 5 days (http://en.wikipedia.org/wiki/SS_Robert_E._Peary), still outdoes something like this. They didn't have anywhere near the technology that we have today.
__________________
Appreciate 0
      11-12-2010, 05:26 PM   #5
KingOfJericho
Major General
KingOfJericho's Avatar
United_States
2458
Rep
7,341
Posts

Drives: Yes
Join Date: Aug 2007
Location: CT

iTrader: (1)

Garage List
2010 135i Coupe  [5.26]
If you put a 1000 piece puzzle together into several sections of 50 pieces in one room over an 8 hour period then move them to another room and put the now-20 pieces together in 5 minutes, did you solve a puzzle in 5 minutes?


EDIT: Seminole beat me to it...
__________________
The views and opinions expressed in this post are those of the author and do not necessarily reflect the official policy or position of Bimmerpost.

2018 Jeep Grand Cherokee High Altitude Hemi | 2010 S4 Sold | 2010 BMW 135i Retired | 2006 Lotus Exige Sold
Appreciate 0
      11-12-2010, 05:30 PM   #6
DougLikesBMW
Fapmin
DougLikesBMW's Avatar
439
Rep
2,660
Posts

Drives: '03 E46 330Ci
Join Date: Mar 2007
Location: Plano, Texas

iTrader: (0)

Quote:
Originally Posted by Seminole View Post
Since it was pre-fab it's not really that much of a surprise. If all the pieces were already assembled and people worked around the clock the same thing could be accomplished here. And not to nit-pick or anything, but when they stop the time lapse video, the whole bottom half of the building and the top part doesn't have windows installed yet. I'd also be curious to know if that 6 days was just the exterior shell or included all the interior walls, pluming, wiring, etc.

To me some of the stuff they did during WW2, like building a entire Liberty ship from keel to completion in less than 5 days (http://en.wikipedia.org/wiki/SS_Robert_E._Peary), still outdoes something like this. They didn't have anywhere near the technology that we have today.
True enough, but still pretty crazy imo.
Appreciate 0
      11-12-2010, 05:34 PM   #7
Seminole
Colonel
Seminole's Avatar
United_States
480
Rep
2,032
Posts

Drives: Red Flyer
Join Date: Aug 2008
Location: 38.8977° N, 77.0366° W

iTrader: (2)

Garage List
2008 E90 328i  [7.00]
Quote:
Originally Posted by DougLikesBMW View Post
True enough, but still pretty crazy imo.
Definitely. I think it was more of a publicity stunt, but it was still neat.
__________________
Appreciate 0
      11-12-2010, 05:38 PM   #8
Kroy
Brigadier General
Kroy's Avatar
United_States
177
Rep
3,032
Posts

Drives: E90
Join Date: Jul 2009
Location: Los Angeles, CA

iTrader: (1)

somehow i doubt this building will stand a 9.0 earthquake. still amazing.
Appreciate 0
      11-12-2010, 05:40 PM   #9
solefald
Nigerian Prince
solefald's Avatar
Vatican City State
400
Rep
2,180
Posts

Drives: '11 F25
Join Date: Apr 2008
Location: San Diego, CA

iTrader: (2)

Garage List
'11 BMW F25  [0.00]
yes, them Chinese builders are known for their quality work.

__________________
Appreciate 0
      11-12-2010, 05:47 PM   #10
Kroy
Brigadier General
Kroy's Avatar
United_States
177
Rep
3,032
Posts

Drives: E90
Join Date: Jul 2009
Location: Los Angeles, CA

iTrader: (1)

DAMN! neighboring buildings were SOOO lucky to escape unscathed.
Appreciate 0
      11-12-2010, 05:48 PM   #11
CollinsE90
Where my bitches
CollinsE90's Avatar
United_States
795
Rep
1,924
Posts

Drives: Cadillac coupe deville
Join Date: Mar 2009
Location: street corner checking profits

iTrader: (0)

I wonder how much rice was shipped in for the build
__________________
Appreciate 0
      11-12-2010, 05:54 PM   #12
DougLikesBMW
Fapmin
DougLikesBMW's Avatar
439
Rep
2,660
Posts

Drives: '03 E46 330Ci
Join Date: Mar 2007
Location: Plano, Texas

iTrader: (0)

Quote:
Originally Posted by solefald View Post
yes, them Chinese builders are known for their quality work.

[u2b]75ng-6_c-jo[u2b]
Lotus Riverside development in Shangai June 27, 2009. Basically what happened was the developer ignored repeated warnings from project supervisors.

Quote:
The South China Morning Post noted that the pilings used in the Lotus Riverside development, made of prestressed, precast concrete piles, are outlawed in Hong Kong because they aren’t strong enough to support the kind of ultra-high buildings that are common in Hong Kong. But in mainland China, they are often used because buildings there are typically much shorter.
Since then developers are much more closely watched and materials re-evaluated.
Appreciate 0
      11-12-2010, 06:26 PM   #13
JayKay335i
Banned
Egypt
198
Rep
5,046
Posts

Drives: ///M323 DCT
Join Date: Apr 2009
Location: North Dakota; its best DUHHHHHH

iTrader: (1)

It turns out the hotel was actually a cheap imitation of another hotel, and collapsed 18 days later.
Appreciate 0
      11-13-2010, 12:29 AM   #14
Tondtar
12 yr old Juvie
Tondtar's Avatar
Vanuatu
1145
Rep
881
Posts

Drives: His Mom Crazy
Join Date: Apr 2008
Location: El Lay

iTrader: (2)

Garage List
Let's see how many days it takes for them to fill it up with paying guests.
Appreciate 0
Post Reply

Bookmarks

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 07:55 AM.




g60
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
1Addicts.com, BIMMERPOST.com, E90Post.com, F30Post.com, M3Post.com, ZPost.com, 5Post.com, 6Post.com, 7Post.com, XBimmers.com logo and trademark are properties of BIMMERPOST