Quote:
Originally Posted by jphcbpa
US gets 530i, i5 40 and i5 m60 first - SOP 7/23
So I would guess reveal end of May and order guides in 2 - 3 weeks after ?? Allocations in June ?
I would be waiting for either 540i, 550e (11/2023 or M560e (7/2024).
|
My M550i lease ends 12/23 and I want the equivalent G60 which looks to be the M560e in 7/24. Huge dilemma on how to bridge the gap. And I still want the V8!